20FT and 40FT overheight container spreader
1:Product Description
This spreader is suitable the double-link portal crane or jib crane, and the main paraments is as follows:
1, Suitable for 20`-40` telescopic spreader
2, Capacity under spreader: 40t
3, lifting capacity of four lugs: 10t*4
4, Dead weight: ~7800
5, dead weight of rotation hook: 1600kg
6, Power: AC380V(3phase)50Hz or 60Hz
7, IP class: IP55
Detailed Photos
3:Packing and Shipping:
4:Our Services:
Act as a good adviser and assistant of client, we can help them to get rich and generous returns on their investment.
1.Pre-sale services:
a: Design customised project for clients.
b: Design and manufcture products according to clients special requirement.
c: Train technical personnel for clients.
2.Services during the sale:
a: Help clients to find reasonable freight forwarders ahead of delivery.
b: Help clients to draw solving plans.
3.After-sale services:
a:Assist clients to prepare for the construction scheme.
b:Install and debug equipment.
c:Train the first-lin operators.
d: Examine equipment.
e: Take initiative to eliminate the troubles immediately.
f:Provide techical exchanging.
5. Parts Introduction
1. Lever For Operating Rope
2. 20'&40'Heavy Duty Container Spreaders
3. Semi-Automatic or Manual Operation
4. Extra Large Lifting Rings 180*340mm 180*340mm
5. Actuation Spring
6. Spring Support
7. Operating Handle
8. Twist lock
9. Actuation Gear For Semi-Automatic Operation
6.Spreader Characteristics
1.The spreader adopts box-type end beam, so the structure is stable. The twist lock is leak proof structure, which protects the parts from rusting
2. Four hoist points structure, which lighten the dead weight of the spreader, and enhance the stability of the spreader.
3HS20'/ HS40' spreader adopt Heavy hammer type semi-automatic twist lock,manpower to turn the pin is no need any more, which highly improve the work efficiency and safety on spot
7.Safety Test
1. Each spreader should be carried out 150% static load test before delivering.
2. All the lifting eyes should be carried out safety test.
3.Each twist lock should be carried out 25t safety test.
8. Safety Protection
.When the spreader lifts container, the load should not exceed the max. SWL.
2.When using the spreader, using design function only.
3. Person shouldn't stand under the lifting spreader.
4. After operation, please check if there are damages on the spreader, if fasteners loose. If so, please repair timely.
9:Repair and Maintenance
1.Twist lock
1.Each twist lock should be lubricated (Grease ZG-3), lubricate the spreader half a year.
2 Hinge point of the connecting rod should be lubricated frequently.
3. After operation, please check if there are damages on the twist lock.
Bearing block of the connecting rod should be lubricated frequently.
2.1. After 50 hours' and 250 hours' operation, all the fasteners should be fastened again, and all the lubricating parts should be lubricated.
2. After 100 hours' operation or lifting 1500 containers, check if all the screws and fasteners are fastened. If loose, please fasten again.
3. After 1000 hours' operation or lifting 15000 containers, all the lubricating parts should be lubricated.
4. After 1500 hours' operation or lifting 25000 containers, the twist lock structure should be checked.
aDisassemble all the four twist lock structures.
b)If any problem, please replaced accordingly.
c)Washing all the parts.
d)Install the four twist lock structures.
5. After 3000 hours' operation or lifting 50000 containers, the twist lock structure should be checked, if there are cracks or other faults, please replace timely.
After 6000 hours' operation or lifting 100000 containers, please replace the twist lock structure.
10:FAQ:
Before you send us an inquiry about container spreader, please let us know some information as following:
1:What is lifting capacity of spreader?
What is type of spreader? Semi automatic container spreader, New I type spreader, motor spreader, hydraulic telescopic spreader or electro telescopic spreader?
2:If what you need is telescopic spreader, please confirm it is hydraulic telescopic or electric telescopic?
3:What is the using temperature of spreader?
4:Will you match a rotator with the telescopic spreader?
Technical Specification
.Scope of supply
HS20 /HS40 GBM..,
One unit 20'/40' GBM automatic container spreader. It includes 4 steel wire ropes, which have rigging rings at the end of the steel wire ropes. The ends that connect with the crane have a concentrated ring.
Item |
20' |
40' |
Max. SWL |
≈ 35 t |
≈40 t |
Dead Weight |
≈1.8t |
≈3.1t |
. Overall Dimensions
Item |
20' |
40' |
():
Distance between lock centers(length) |
≈ 5853 mm |
≈11985 mm |
():
Distance between lock centers(width) |
≈ 2260 mm |
≈2260 mm |
:
Overall Length |
≈ 6058 mm |
≈12188 mm |
:
Overall Width |
≈ 2610 mm |
≈2610 mm |
:
Frame Height |
≈ 636 mm |
≈731 mm |
. Technical Parameter
Item |
20' |
40' |
Dia. of pressed wire rope slings |
32 mm |
36 mm |
Length of pressed wire rope slings |
3.5m per piece
(4 pieces for each set) |
8.5m per piece
(4 pieces for each set) |
Steel Frame |
Material Q345B |
Material Q345B |
ISO Standard Fixed Twist Lock |
Material 42CrMo
|
Material 42CrMo
|
Twist Lock Device |
Finish the Twist locks action via semi-automatic Elastic lasso |
Finish the Twist locks action via semi-automatic Elastic lasso |
. Surface Treatment & Painting
1.
Flame dirt-remover, and then shot blasting.
2. 40µm,,80µm/40µm.
Primer coating (Epoxy resin paint) app. 40µm
Middle (Epoxy resin paint) app. 80µm
Top paint (Polyurethane paint) app. 40µm.
(),,
The top coat paint color is yellow. There is scutcheon with the main specifications, manufacture date and exfactory number.
. Technical Documents
When delivering, the seller provides:
drawings of the spreader& quick-wear parts
()Operation Manual
Certificate of Quality
. Parts Introduction
1. Lever For Operating Rope
2. 20'&40'Heavy Duty Container Spreaders 20'&40'
3. Semi-Automatic or Manual Operation
4. Extra Large Lifting Rings 180*340mm 180*340mm
5. Actuation Spring
6. Spring Support
7. Operating Handle
8. Twist lock
9. Actuation Gear For Automatic Operation
. Spreader Characteristics
1. ,,,.
The spreader adopts box-type end beam, so the structure is stable. The twist lock is leak proof structure, which protects the parts from rusting
2. ,,.
Four hoist points structure, which lighten the dead weight of the spreader, and enhance the stability of the spreader.
HS20'/ HS40',,,,.
HS20'/ HS40' spreader adopt Heavy hammer type semi-automatic twist lock, manpower to turn the pin is no need any more, which highly improve the work efficiency and safety on spot
. Safety Test
1. 150%.
Each spreader should be carried out 150% static load test before delivering.
2. .
All the lifting eyes should be carried out safety test.
3. 25.
Each twist lock should be carried out 25t safety test.
.Safety Protection
1. ,.
When the spreader lifts container, the load should not exceed the max. SWL.
2. ,.
When using the spreader, using design function only.
3. .
Person shouldn't stand under the lifting spreader.
,,.,.
After operation, please check if there are damages on the spreader, if fasteners loose. If so, please repair timely.
.Repair and Maintenance
() Twist lock
1. (ZG-3),.
Each twist lock should be lubricated (Grease ZG-3), lubricate the spreader half a year.
2. (ZG-3).
Hinge point of the connecting rod should be lubricated frequently.
3. ,.
After operation, please check if there are damages on the twist lock.
(ZG-3).
Bearing block of the connecting rod should be lubricated frequently.
()
1. 50250,,.
After 50 hours' and 250 hours' operation, all the fasteners should be fastened again, and all the lubricating parts should be lubricated.
2. 1001500.,.,,.
After 100 hours' operation or lifting 1500 containers, check if all the screws and fasteners are fastened. If loose, please fasten again.
3. 100015000,.
After 1000 hours' operation or lifting 15000 containers, all the lubricating parts should be lubricated.
4. 1500,25000,.
After 1500 hours' operation or lifting 25000 containers, the twist lock structure should be checked.
a)
Disassemble all the four twist lock structures.
b) ,.
If any problem, please replaced accordingly.
c) .
Washing all the parts.
d) .
Install the four twist lock structures.
5. After 3000 hours' operation or lifting 50000 containers, the twist lock structure should be checked, if there are cracks or other faults, please replace timely 6000.100000, After 6000 hours' operation or lifting 100000 containers, please replace the twist lock structure.