Gold Member Since 2016
Audited Supplier
Shanghai Enjue Machinery Equipment Co., Ltd.

Automatic Container Spreader, Semi Automatic Spreader, 40 Feet Container Spreader manufacturer / supplier in China, offering Container Spreader/Mobile Type Container Spreader/Fixed Spreader Beam, Dust-Trap Hopper Mobile Type Dusting Hopper Dedusting Hopper Loader Dust Proof Moveable Hopper for Port, Remote Control Hydraulic Grab with Good Quality and so on.

(/ )

Supplier Homepage Product Container spreader Mechnical spreader Container Spreader/Mobile Type Container Spreader/Fixed Spreader Beam

Container Spreader/Mobile Type Container Spreader/Fixed Spreader Beam

FOB Price: US $1,000-10,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1,000-10,000/ Piece
Get Latest Price
Port: Shanghai, China
Production Capacity: 500 Sets/Year
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Enjue-1901
  • Container Spreader: Semi-Automatic Container Spreader
  • Power Source: Electric
  • Trademark: China Enjue
  • Specification: 20ft or 40ft
  • HS Code: 8426194200
  • Color: Customized
  • Certification: ISO 9001
  • Application: All
  • Transport Package: Nude Package or as Your Required
  • Origin: China
Product Description
One unit 20/40' GBM automatic container spreader. It includes 4 steel wire ropes, which have rigging rings at the end of the steel wire ropes. The ends that connect with the crane have a concentrated
Surface Treatment & Painting
1. Flame dirt-remover, and then shot blasting.
 
2. 40µm80µm/40µm
Primer coating (Epoxy resin paint) app. 40µm
Middle (Epoxy resin paint) app. 80µm
Top paint (Polyurethane paint) app. 40µm.
 
The top coat paint color is yellow. There is scutcheon with the main specifications, manufacture date and exfactory number.
 
Technical Documents

When delivering, the seller provides:
drawings of the spreader& quick-wear parts
Operation Manual
Certificate of Quality
 
Parts Introduction
1.  Lever For Operating Rope 
2.  20'&40'Heavy Duty Container Spreaders  20'&40'
3.  Semi-Automatic or Manual Operation
4.  Extra Large Lifting Rings 180*340mm  180*340mm
5.  Actuation Spring
6.  Spring Support
7.  Operating Handle
8.  Twist lock
9.  Actuation Gear For Automatic Operation
Spreader Characteristics
1. The spreader adopts box-type end beam, so the structure is stable. The twist lock is leak proof structure, which protects the parts from rusting
2.Four hoist points structure, which lighten the dead weight of the spreader, and enhance the stability of the spreader.
HS20'/ HS40'HS20'/ HS40' spreader adopt Heavy hammer type semi-automatic twist lock, manpower to turn the pin is no need any more, which highly improve the work efficiency and safety on spot
 
Safety Test
1. 150%Each spreader should be carried out 150% static load test before delivering.
2. All the lifting eyes should be carried out safety test.
3. 25
   Each twist lock should be carried out 25t safety test.
 
Safety Protection
1. When the spreader lifts container, the load should not exceed the max. SWL.
2. When using the spreader, using design function only.
3.Person shouldn't stand under the lifting spreader.
After operation, please check if there are damages on the spreader, if fasteners loose. If so, please repair timely.
  
 
Repair and Maintenance
 
Twist lock
Each twist lock should be lubricated (Grease ZG-3), lubricate the spreader half a year.
2Hinge point of the connecting rod should be lubricated frequently.
3. After operation, please check if there are damages on the twist lock.
   Bearing block of the connecting rod should be lubricated frequently.  
After 50 hours' and 250 hours' operation, all the fasteners should be fastened again, and all the lubricating parts should be lubricated. 
2. 1001500
   After 100 hours' operation or lifting 1500 containers, check if all the screws and fasteners are fastened. If loose, please fasten again.
3. 100015000
   After 1000 hours' operation or lifting 15000 containers, all the lubricating parts should be lubricated.
4. 150025000.
   After 1500 hours' operation or lifting 25000 containers, the twist lock structure should be checked.
a)
    Disassemble all the four twist lock structures.
b)
    If any problem, please replaced accordingly.
c)
    Washing all the parts.
d)
    Install the four twist lock structures.
5.300050000
   After 3000 hours' operation or lifting 50000 containers, the twist lock structure should be checked, if there are cracks or other faults, please replace timely.
100000   After 6000 hours' operation or lifting 100000 containers, please replace the twist 
lock structure.

 
You Might Also Like
Send your message to this supplier
Avatar
Mr. Michael
project manager
*From:
To: Mr. Michael
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now