• Manual Operated Container Lifter Spreader with ISO BV CCS Certificated Manufacturer
  • Manual Operated Container Lifter Spreader with ISO BV CCS Certificated Manufacturer
  • Manual Operated Container Lifter Spreader with ISO BV CCS Certificated Manufacturer
  • Manual Operated Container Lifter Spreader with ISO BV CCS Certificated Manufacturer
  • Manual Operated Container Lifter Spreader with ISO BV CCS Certificated Manufacturer
  • Manual Operated Container Lifter Spreader with ISO BV CCS Certificated Manufacturer

Manual Operated Container Lifter Spreader with ISO BV CCS Certificated Manufacturer

Color: Customized
Type: Automatic
Delivery Time: 30days
Delivery Port: Shanghai Port
Transport Package: Nude Package or as Your Required
Specification: 20ft or 40ft
Customization:

Contact Supplier

Ms. Alice
Whatapp: +86-15801995172
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Trademark
China Enjue
Origin
China
HS Code
843141000
Production Capacity
3000 Sets/Year

Product Description

                          Automatic container spreader without power
Manual operated Container lifter Spreader with ISO BV CCS certificated  Manufacturer
TypeSWLDead Weight
20feet  Container spreader25-35T1.2-2.6T
40feet  Container spreader32-45T 
Automatic container spreader without power
The spreader is equipped on 40t gantry crane to load and unload containers. The spreader is light, no power, easy to operate and cheap. There are two kinds of spreader 32t-20' and 40t-40'.
Operation: first put the four main lifting ropes riggings of the spreaders and one turning stretch wire rope in the hook of the gantry crane. Before lifting, the guider points to open direction. By the localizers at the four sides of the spreader and the skilled operation, the four turning locks of spreader are locked into the corner, and then the hook is started slowly.  The stretch wire rope is firstly tight to pull turning mechanism and turn the turning lock in 90°and be closed, and then keep lifting the hook .The container is lifted.
Lay container down: After hanging containers to be scheduled position, keep the hook fall about 1-2m and then lift the hook again. Before the main lifting wire rope is dragged, lift turning rope to make turning lock back to open position and lift the hook to depart the spreader and container .By now the operation is finished.
Maintenance: The link pole of the spreader and turning mechanism should be opened to check regularly and add lubricating oil to make every part turn fluently. If there are obvious damages and distortion, spreader and wire rope should stop work at once.



 
 

Send your message to this supplier

*From:
*To:
avatar Ms. Alice
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Ms. Alice
Whatapp: +86-15801995172
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 9000
OEM/ODM Availability
Yes